You are using an outdated browser. Please upgrade your browser to view our website properly.

Harbourfront (nutrimetics Site)

Register your interest

Development overview

Status
Construction Commenced
Suburb

Balmain, 2041

Project type

Apartments

Floor count

7

Building type

Low-rise

Development size

121 residences

Development details


Demolition
Mixed use development over 8 buildings
102 residential units
9 x ground floor commercial units (upper & lower ground levels)
19 serviced apartments
Gymnasium
Balconies
2 level basement (with mezzanine) car parking (245 spaces)
Bicycle storage
Residential storage
Stair & lift access to all levels
Bulk earthworks
Car was bay
Kitchen
Tree removal
Landscaping
Signage
Remediation

Proposed uses of each building:



Building A1 (Part 3 & 4 storeys) – Retail shop at ground floor & residential uses above

Building A2 (Part 2 & 3 storeys) – Commercial offices at ground floor & residential uses above within terrace house typology

Building B1 (4 storey) – Serviced apartments at the ground floor and residential uses above

Building B2 (4 storey) – Commercial offices at ground floor & residential uses above

Building C1 (Part 4 & 5 storeys) – Serviced apartments & gymnasium at ground floor & residential uses above

Building C2 (5 storey) – Serviced apartments at ground floor & residential uses above

Building C3 (4 storey) – Serviced apartments at ground floor & residential uses above

Building C4 (Part 3 & 4 storeys) – Serviced apartments at ground floor & residential uses above

Building elements include:


Aluminium framed sliding doors & windows
Sash windows
Adjustable vertical aluminium louvres
Fixed vertical & horizontal aluminium louvres
Aluminium framed hinged glass doors
Stone cladding
Lighting
Telephone & electrical cabling
Fire safety equipment
Bathroom & Kitchen fixtures
Lifts
Steel balustrades
Painted raked brickwork
Metal clad canopy
Painted render
Metal roofing & cladding
Concrete slab
Formwork

Project website: www.harbourfrontbalmain.com.au NB: BCA section J compliance report done by Thermal Environmental but contact details not disclosed.NB: Basix done by ESD Senergy but contact details not available.
Read lessmore