You are using an outdated browser. Please upgrade your browser to view our website properly.

Harold Park - Former Harold Park Paceway Site - Overall

Register your interest

Development overview

Status
Development Approval
Project type

Properties

Floor count

10

Building type

Low-rise

Development size

1250 residences

Development details


Apartments & medium density houses (up to 1,250)
Adaptive re-use of existing tram sheds
Apartment buildings
Open space parklands
Commercial spaces
Community facilities
Non residential floor space (7,565 sq m)
Senior housing units (up to 5,500 sq m)
Disability sports centre
Car parking spaces
Internal roads & pathways
Cycle paths
Excavation works
Landscaping works

Public domain works

Precinct 2 (Construction Commenced)


Buildings 2A & 2B
Residential spaces (18,854 sq m)
169 x studio, 1, 2 & 3 bedroom apartments
Retail spaces (65 sq m)
Building 2B (90 apartments)
Building 2A (79 apartments)
Living area
Dining area
Kitchen area
Bathroom & ensuite
Basement (2 levels)
171 car parking spaces
Excavation works
Landscaping works

Precinct 3 (Construction Commenced)


Buildings 3A, 3B, 3C & 3D (30,502 sq m)
347 x studio, 1, 2 & 3 bedroom apartments
Building 3A (94 apartments)
Building 3B (84 apartments)
Building 3C (95 apartments)
Building 3D (74 apartments)
Living area
Dining area
Kitchen area
Bathroom & ensuite
Basement (2 levels)
297 car parking spaces
Excavation works
Landscaping works

Precinct 4 (Construction Commenced)


Buildings 4A & 4B (13,965 sq m)
Living area
Dining area
Kitchen area
Bathroom & ensuite
Landscaping works

Precinct 5 (Construction Commenced)


Buildings 5A & 5B (18,750 sq m)
Living area
Dining area
Kitchen area
Bathroom & ensuite
Landscaping works

Precinct 6 (Construction Commenced)


Buildings 6A & 6B (13,902 sq m)
Living area
Dining area
Kitchen area
Bathroom & ensuite
Landscaping works

Precinct 6A (Construction Commenced)


Demolish existing commercial & residential buildings
40 x single bedroom affordable housing units
31 x 2 bedroom affordable housing units
4 x 3 bedroom affordable housing units
Living area
Dining area
Kitchen area
Bathroom & ensuite
Study area
Rooftop garden terrace
Storage room
Plant & service room
Basement
35 car parking spaces
Landscaping works
Excavation works

Tram Shed Precinct (Construction Commenced)


Partial demolition & strip out of existing structures & services
Adaptive re-use of existing tram sheds
Retail spaces (7,500 sq m)
Services installations & upgrades

Building elements include:


Concrete slab
Aluminium framed doors & windows
Aluminium framed sliding doors
Structural steel frame
Glass balustrades
Aluminium awning
Aluminium louvres
Glazing
Glass panels
Parapet
Roller shutter doors
Signage
Precast concrete panels
Masonry
Face brickwork
Metal cladding
Timber cladding
Insulation
Ceramic floor tiles
Carpet
Carpentry & joinery
Rendered & painted finish
Gutters & downpipes
Air conditioning units
Lifts
Stairs
Metal handrails
Cabinetry
Sanitary fixtures
Plumbing & fittings
Telephone & electrical cabling
Smoke alarms & fire detection system
Security alarm system
Hot water system

Associated Project ID: 3932010 - Precinct 1 (Construction Commenced)Associated Project ID: 12792021 - Tram Shed Precinct (Construction Commenced)Associated Project ID: 18075021 - Precinct 6B (Construction Commenced)Associated Project ID: 19657021 - Precinct 4 (Construction Commenced)Associated Project ID: 25604021 - Precinct 5 (Construction Commenced)Associated Project ID: 26626021 - Precinct 6A (Construction Commenced)Project Website: www.haroldparkbymirvac.com
Read lessmore